Your project · 02 · Architects and landscape designers

A cooling solution to write into the brief.

Planting takes years, and shade isn't enough when the ground gives the heat back. You need a third answer, one you can specify, with the technical data to write it in.

Documentation
Technical data sheets for each module
Design
Modular units, combined into islands
Structure
No anchoring, no incorporation
Method
A public-space project-management background
1 · Your situation

What brings you here

  • Public-space regeneration programmes
  • Clients who want greenery quickly
  • Constraints on utilities, ground or schedule
2 · Our response

What we offer

Modules that combine into a custom island: planters, stations, water-production module. Set down, never anchored, so never incorporated into the structure. We design the layout and the planting palette with you.

3 · Next steps

How we move forward

  1. 01Opportunity study of your project sites
  2. 02Technical data sheets and specification material
  3. 03Layout designed with your team
Where to startThe custom island

Composed for an entire square, quay or forecourt.

See the details
Top view: the Station and two planters assembled in a fan.
Opportunity study · free

Is your site right for an oasis?

Enter the address: we cross-check public data (Météo-France, IGN, OpenStreetMap) with your answers. You see the score out of 10 straight away, and the full study arrives by email. And if another location would suit better, we'll tell you.

Type of site
About 3 minutes · no commitment · instant result
FAQ

Your questions, our answers.

All questions →

What technical documents do you provide?

Technical data sheets for each module, layout material, and a 3D model on request.

How is maintenance built into the project?

Maintenance is agreed with the client: in-house, or under a BORVO maintenance contract.

We're short of space: where can it go?

Where a tree cannot be planted: on a slab, above a car park, close to a façade or to buried utilities. With no anchoring and no pit, the oasis sits on the existing surface, moves aside for an event or works, and its layout evolves with the site.

Why not simply plant trees?

The two go hand in hand. A street tree costs €4,500 on average and needs a 9 to 15 m³ pit, and it is a long-term investment: it takes years before it gives real shade, years during which its watering remains subject to possible restrictions. The oasis goes where a tree cannot, and cools from the day it is commissioned.

Isn't the effect too local?

It is a targeted impact, by design: creating cool spots where people pass, stop and shop. Even a tree only acts over a few dozen metres: cooling a town means adding up cool spots. Several oases, from square to square, form a cool route.

Other projects
Request a quote

Let's talk about your site. Call back within 48 h.

Not a switchboard: the person who will study your site calls you, with a first reading of your constraints.

Portrait of Alexis
AlexisSales engineer · your contact